Samsung's First Digital Twin

Building and campus management

Built Samsung's first Digital Twin from 0 to 1, uniting building and campus operations and energy management around space.

Period
2023.09 – 2024.04
Role
UX PM (PRD, goals, priorities and schedule) and UI/UX design lead
Awards
2026 iF Design Award · 2025 IDEA Design Award, Silver

Led it from 0 to launch, then handed it over — later growth came after the hand-over.

Samsung b.IoT Digital Twin on a large control-room wall — campus buildings in translucent 3D with floor temperatures in color, flanked by energy, elevator, lighting and robot dashboards.
2025 IDEA Design Award Silver — Samsung b.IoT Digital TwinIDSA — IDEA 2025 winner ↗

Context · Problem

The scattered operation and energy management of buildings and campuses needed one place to come together — around the space itself.

A first for Samsung

With no internal precedent, the need and the goals had to be defined from scratch.

Two values at once

Building operations and energy saving are different values that had to live in one experience.

Accuracy

Both management and energy saving only mean something if they match real spatial data.

Role · Approach

Beyond designer, as UX PM — deciding what to build, why and when

Role: UX PM (PRD, goals, priorities and schedule) and UI/UX design lead

  1. 01

    Finding the need, setting goals

    As UX PM, identified the need for a Digital Twin and wrote the PRD to set its goals.

  2. 02

    Priorities and schedule

    Ranked features by importance and planned the development schedule around them.

  3. 03

    Design criteria

    Set design criteria aimed at more accurate building management and energy saving.

  4. 04

    Hand-over after launch

    After taking it to launch, handed the solution over to a colleague for company-wide rollout.

Key Design

Spatial view × energy-saving solution

The 0→1 I led · 2023.09 – 2024.04Found the needPRD and goals as UX PMFeature priorities and scheduleSpatial view × energy-saving UX/UI completedCriteria for accurate management and energy savingLaunchHanded over for company-wide rolloutGrowth after the hand-overPilots at Samsung sites in Vietnam and PolandCompany-wide · domestic R&D buildings · overseas salesRolling out to all Samsung sites in KoreaFactorial Seongsu — Korea's first SmartScore Gold (2026.01)Samsung b.IoT digital twin · ~27% cooling/HVAC energy saved (2025.06–09 study)
  1. 1

    A spatial Digital Twin view

    Put a view that shows buildings and campuses as they are at the center of operations.

  2. 2

    Combined with energy saving

    Completed a UX/UI that combines the spatial view with the energy-saving solution to get the most out of both.

  3. 3

    Built to scale

    Grew into a solution that started at one site and spread to many sites and buildings.

Impact

  • iF 2026iF Design Award
  • IDEA 2025IDEA Design Award, Silver
  • Piloted at Samsung sites in Vietnam and Poland, then expanded company-wide
  • Applied to domestic R&D buildings and used in overseas sales
  • Rolling out to all Samsung Electronics sites in Korea
  • Presented in the CES 2024 VIP room
  • Factorial Seongsu, running Samsung b.IoT, became Korea's first building to earn WiredScore SmartScore Gold, a global smart-building certification (2026.01) — b.IoT operation cut cooling/HVAC energy use by about 27% (2025.06.01–09.30, per a Pukyong National University study)
  • 2026 iF Design Award, 2025 IDEA Design Award Silver